Client | Project | Work category | Scope (See Note) | Summary | Fab. Site | Project Site | Date Awarded | Completion Date | Main or SUB Contractor |
PDO/STST | UFUQ FACILITY DEVEL | DESIGN & ENGINE | EPF | DESIGN, MANUFATURE, INSPECTION, TESTING AND SUPPLY OF CHEMICAL INJECTION INHIBITOR SKID DEMULSIFIER 1 NOS | MIS SHARJAH YA | OMAN/LE | August-12 | Nov-13 | SUB |
PDO/STST | FAHUD H2S MANAGE | DESIGN & ENGINE | EPF | DESIGN, MANUFATURE, INSPECTION, TESTING AND SUPPLY OF H2S CHEMICAL INJECTION SKID 3 NOS | MIS SHARJAH | OMAN/ F | Jun-12 | May-13 | SUB |
PDO/WORLEY PARS | AMAL STEAM PROJEC | DESIGN & ENGINE | EPF | DESIGN, MANUFATURE, INSPECTION, TESTING AND SUPPLY OF VESSELS 6 NOS | MIS/SHARJAH Y | OMAN/ A | 2010 | Apr-11 | SUB |
INTERNATIONAL PE | BUKHA PLATFORM | FABRICATION, SITE | FS | COMPLETED ON FAST TRACK SCHEDULE, THE | MIS / OPMI BAH | OMAN | JUL. 1992 | DEC. 1993 | MAIN |
KCC/ PDO | SLUG CATCHER VESSEL | DESIGN & ENGINE | EPF | SUPPLY & FABRICATION OF SLUG CATCHER VESSEL, CONTROL ASSEMBLY OF PIPING AND FIM, QC, TESTING AND TRANSPORTATION. | MIS SHARJAH YA | OMAN NI | FEB. 2000 | JULY. 2000 | SUB |
MB PETROLEUM | FABRICATION OF 3 PHASE SEPARATOR PACKAGE | ENGINEERING, PR | EPF | THE SEPARATORS WERE DESIGNED TO MEET ASME VIII DIV.1 CODE REQUIREMENTS. THEY WERE ASSEMBLED ON STEEL STRUCTURE SKID WITH ALL NECESSARY PIPING, ELECTRICAL & INSTRUMENTATION REQUIRED FOR 3-PHASE SEPARATION. | MIS OMAN YAR | OMAN | MAR. 1998 | FEB. 1999 | SUB |
MB PETROLEUM | MUD SKID PACKAGE | DESIGN & ENGINE | EPF | INVOLVES PROCESS, DESIGN, PROCUREMENT | MIS OMAN YAR | OMAN | MAY. 1998 | JAN. 1999 | MAIN |
STORK ENGINEERS / | ATHEL PROJECT | DESIGN & ENGINE | EPFSY | SUPPLY OF SKID MOUNTED UNITS AND OFF- | MIS OMAN YAR | OMAN | MAR. 1999 | OCT. 1999 | SUB |
OMAN REFINERY C | STEEL UNDERGROUND | ENGINEERING, PR | EPF | MATERIAL PROCUREMENT, FABRICATION, TE | MIS SHARJAH YA | OMAN | JAN. 1997 | APR. 1998 | MAIN |
OCCIDENTAL OF O | SUPPLY OF KNOCKOUT POTS & GLYCOL HEAT EXCHANGERS |
FABRICATION AND ONSHORE CONSTRUCTION |
EPF | MECHANICAL DESIGN, PROCUREMENT, AND FABRICATION OF 2 KNOCK OUT POTS FOR CAMP GENERATORS AND, PROCUREMENT OF 2 GLYCOL HEAT EXCHANGERS. |
MIS SHARJAH YARD |
OMAN | SEPT. 1996 | DEC. 1996 | MAIN |
PDO | SUPPLY OF 1 FLASH VESSEL |
FABRICATION & ONSHORE CONSTRUCTION |
EPF & PROCESS DESIGN |
MECHANICAL DESIGN, DETAIL ENGINEERING, PROCUREMENT, FABRICATION, TESTING & PAINTING OF FLASH VESSEL AND TRANSPORT TO PDO STORE. |
MIS SHARJAH YARD |
OMAN | DEC. 1996 | FEB. 1997 | MAIN |
OCCIDENTAL OF OMAN |
SAFAH FIELD GAS COMPRESSION AND PROCESSING FACILITIES |
ONSHORE CONSTRUCTION |
EPFSC | ADD 5 2650 HP RECIPROCATING GAS COMPRESSION UNITS TO ACCOMMODATE
A GAS PLANT EXPANSION OF 60 MMSCFD. ALSO PERFORMED SEVERAL EXISTING PLANT MODIFICATIONS AND TIE-INS AS WELL AS FABRICATED ALL VESSELS AND SURGE BOTTLES REQUIRED FOR THE COMPRESSOR UNITS. |
MIS SHARJAH | SAFAH FIELD, OMAN |
Jun-90 | AUG. 1991 | MAIN |