Client    Project Work category Scope (See Note)  Summary Fab. Site Project Site Date Awarded Completion Date Main or SUB Contractor
PDO/STST  UFUQ FACILITY DEVELOPMENT LEKHWAIR PROJECT DESIGN & ENGINEERING, PROCUREMENT, FABRICATION EPF DESIGN, MANUFATURE, INSPECTION, TESTING AND SUPPLY OF CHEMICAL INJECTION INHIBITOR SKID DEMULSIFIER 1 NOS  MIS SHARJAH YARD OMAN/LEKHWAIR August-12 Nov-13 SUB
PDO/STST  FAHUD H2S MANAGEMENT & MITIGATION PROJECT DESIGN & ENGINEERING, PROCUREMENT, FABRICATION EPF DESIGN, MANUFATURE, INSPECTION, TESTING AND SUPPLY OF H2S CHEMICAL INJECTION SKID 3 NOS  MIS SHARJAH OMAN/ FAHUD Jun-12 May-13 SUB
PDO/WORLEY PARSONS AMAL STEAM PROJECTS DESIGN & ENGINEERING, PROCUREMENT, FABRICATION EPF DESIGN, MANUFATURE, INSPECTION, TESTING AND SUPPLY OF VESSELS 6 NOS  MIS/SHARJAH YARD OMAN/ AL NOOR 2010 Apr-11 SUB
INTERNATIONAL PETROLEUM BUKHA BUKHA PLATFORM  FABRICATION, SITE INSTALLATION FS COMPLETED ON FAST TRACK SCHEDULE, THE BUKHA PROJECT ACTUALLY COMPRISED OF JACKET AND DECK FABRICATION. TOTAL MANHOURSE RECORDED WERE 296,000 MIS / OPMI BAHRAIN YARD OMAN JUL. 1992 DEC. 1993 MAIN
KCC/ PDO SLUG CATCHER VESSEL AND PLATFORM AND PIPING DESIGN & ENGINEERING, PROCUREMENT, FABRICATION EPF SUPPLY & FABRICATION OF SLUG CATCHER VESSEL, CONTROL ASSEMBLY OF PIPING AND FIM, QC, TESTING AND TRANSPORTATION. MIS SHARJAH YARD / MIS OMAN YARD OMAN NIMR SITE FEB. 2000  JULY. 2000 SUB
MB PETROLEUM FABRICATION OF 3 PHASE SEPARATOR PACKAGE ENGINEERING, PROCUREMENT, FABRICATION EPF THE SEPARATORS WERE DESIGNED TO MEET ASME VIII DIV.1 CODE REQUIREMENTS. THEY WERE ASSEMBLED ON STEEL STRUCTURE SKID WITH ALL NECESSARY PIPING, ELECTRICAL & INSTRUMENTATION REQUIRED FOR 3-PHASE SEPARATION. MIS OMAN YARD OMAN MAR. 1998  FEB. 1999 SUB
MB PETROLEUM MUD SKID PACKAGE DESIGN & ENGINEERING, PROCUREMENT, FABRICATION EPF INVOLVES PROCESS, DESIGN, PROCUREMENT AND FABRICATION OF MUD SYSTEM MIS OMAN YARD OMAN MAY. 1998 JAN. 1999 MAIN
STORK ENGINEERS / PDO ATHEL PROJECT DESIGN & ENGINEERING, PROCUREMENT, FABRICATION EPFSY SUPPLY OF SKID MOUNTED UNITS AND OFF-SKID PACKAGES MIS OMAN YARD OMAN MAR. 1999  OCT. 1999 SUB
OMAN REFINERY COMPANY LLC STEEL UNDERGROUND TANKS FOR ALMAHA STATIONS ENGINEERING, PROCUREMENT, FABRICATION EPF MATERIAL PROCUREMENT, FABRICATION, TESTING & PAINTING OF 60 NO.S 50 KL AND 25 NO.S 25 KL UNDERGROUND FUEL STORAGE TANKS.  MIS SHARJAH YARD OMAN JAN. 1997  APR. 1998 MAIN
OCCIDENTAL OF OMAN SUPPLY OF
KNOCKOUT
POTS & GLYCOL
HEAT
EXCHANGERS
FABRICATION
AND ONSHORE
CONSTRUCTION
EPF MECHANICAL DESIGN,
PROCUREMENT, AND
FABRICATION OF 2 KNOCK OUT
POTS FOR CAMP GENERATORS
AND, PROCUREMENT OF 2
GLYCOL HEAT EXCHANGERS.
MIS SHARJAH
YARD
OMAN SEPT. 1996  DEC. 1996 MAIN
PDO SUPPLY OF 1
FLASH VESSEL
FABRICATION &
ONSHORE
CONSTRUCTION
EPF &
PROCESS
DESIGN
MECHANICAL DESIGN, DETAIL
ENGINEERING, PROCUREMENT,
FABRICATION, TESTING &
PAINTING OF FLASH VESSEL
AND TRANSPORT TO PDO
STORE.
MIS SHARJAH
YARD
OMAN DEC. 1996 FEB. 1997 MAIN
OCCIDENTAL OF
OMAN
SAFAH FIELD GAS
COMPRESSION
AND PROCESSING
FACILITIES
ONSHORE
CONSTRUCTION
EPFSC ADD 5 2650 HP RECIPROCATING GAS COMPRESSION UNITS TO ACCOMMODATE A GAS PLANT EXPANSION OF 60 MMSCFD. ALSO PERFORMED SEVERAL EXISTING
PLANT MODIFICATIONS AND TIE-INS AS WELL AS FABRICATED ALL VESSELS AND SURGE BOTTLES REQUIRED FOR THE COMPRESSOR UNITS.
MIS SHARJAH SAFAH
FIELD, OMAN
Jun-90 AUG. 1991 MAIN